Standard

Possible ways to implement district heating cogeneration under present conditions. / Revzin, B. S.; Komarov, O. V.; Styazhkin, A. A.
In: Thermal Engineering, Vol. 55, No. 4, 2008, p. 336-337.

Research output: Contribution to journalArticlepeer-review

Harvard

APA

Vancouver

Revzin BS, Komarov OV, Styazhkin AA. Possible ways to implement district heating cogeneration under present conditions. Thermal Engineering. 2008;55(4):336-337. doi: 10.1134/S0040601508040125

Author

Revzin, B. S. ; Komarov, O. V. ; Styazhkin, A. A. / Possible ways to implement district heating cogeneration under present conditions. In: Thermal Engineering. 2008 ; Vol. 55, No. 4. pp. 336-337.

BibTeX

@article{22ace5df34994fa68c1959da944fe646,
title = "Possible ways to implement district heating cogeneration under present conditions",
abstract = "We propose a scheme of a combined gas turbine unit intended for medium-capacity units for combined generation of electricity and heat. The use of gas turbine unit constructed in accordance with this scheme makes it possible to have a limited number of peak hot-water boilers. {\textcopyright} 2008 MAIK Nauka.",
author = "Revzin, {B. S.} and Komarov, {O. V.} and Styazhkin, {A. A.}",
year = "2008",
doi = "10.1134/S0040601508040125",
language = "English",
volume = "55",
pages = "336--337",
journal = "Thermal Engineering",
issn = "0040-6015",
publisher = "Pleiades Publishing",
number = "4",

}

RIS

TY - JOUR

T1 - Possible ways to implement district heating cogeneration under present conditions

AU - Revzin, B. S.

AU - Komarov, O. V.

AU - Styazhkin, A. A.

PY - 2008

Y1 - 2008

N2 - We propose a scheme of a combined gas turbine unit intended for medium-capacity units for combined generation of electricity and heat. The use of gas turbine unit constructed in accordance with this scheme makes it possible to have a limited number of peak hot-water boilers. © 2008 MAIK Nauka.

AB - We propose a scheme of a combined gas turbine unit intended for medium-capacity units for combined generation of electricity and heat. The use of gas turbine unit constructed in accordance with this scheme makes it possible to have a limited number of peak hot-water boilers. © 2008 MAIK Nauka.

UR - http://www.scopus.com/inward/record.url?partnerID=8YFLogxK&scp=43249128083

U2 - 10.1134/S0040601508040125

DO - 10.1134/S0040601508040125

M3 - Article

VL - 55

SP - 336

EP - 337

JO - Thermal Engineering

JF - Thermal Engineering

SN - 0040-6015

IS - 4

ER -

ID: 38896721