Standard

Advanced Algorithms in Automatic Generation Control of Hydroelectric Power Plants. / Kazantsev, Yury V.; Glazyrin, Gleb V.; Khalyasmaa, Alexandra I. et al.
In: Mathematics, Vol. 10, No. 24, 2022, p. 4809.

Research output: Contribution to journalArticlepeer-review

Harvard

Kazantsev, YV, Glazyrin, GV, Khalyasmaa, AI, Shayk, SM & Kuparev, MA 2022, 'Advanced Algorithms in Automatic Generation Control of Hydroelectric Power Plants', Mathematics, vol. 10, no. 24, pp. 4809. https://doi.org/10.3390/math10244809

APA

Kazantsev, Y. V., Glazyrin, G. V., Khalyasmaa, A. I., Shayk, S. M., & Kuparev, M. A. (2022). Advanced Algorithms in Automatic Generation Control of Hydroelectric Power Plants. Mathematics, 10(24), 4809. https://doi.org/10.3390/math10244809

Vancouver

Kazantsev YV, Glazyrin GV, Khalyasmaa AI, Shayk SM, Kuparev MA. Advanced Algorithms in Automatic Generation Control of Hydroelectric Power Plants. Mathematics. 2022;10(24):4809. doi: 10.3390/math10244809

Author

Kazantsev, Yury V. ; Glazyrin, Gleb V. ; Khalyasmaa, Alexandra I. et al. / Advanced Algorithms in Automatic Generation Control of Hydroelectric Power Plants. In: Mathematics. 2022 ; Vol. 10, No. 24. pp. 4809.

BibTeX

@article{ab3032a6a18c4cb9a5f724f07f532cc3,
title = "Advanced Algorithms in Automatic Generation Control of Hydroelectric Power Plants",
abstract = "The problem of load distribution between hydraulic units at hydropower plants is a difficult task due to the nonlinearity of hydro turbine characteristics and individual peculiarities of the generation units, in which operating conditions are often different. It is necessary to apply the most up-to-date optimization methods that take into account the nonlinearity of the turbine characteristics. The methods must also consider strict constraints on the operation conditions of the power equipment when searching for the extremum of the objective function specified in the form of equalities and inequalities. When solving the aforementioned optimization problem, the constraints on computing capacities of the digital automatic generation control systems that must operate in real-time mode were taken into account. To solve the optimization task, the interior point method was analyzed and the method of Lagrange multipliers was modified so that it could minimize turbine discharge and active energy losses in the windings of the power generators and unit power transformers. The article presents the simulation results of the developed optimization algorithms and the results of the field tests of the automatic generation control system executing the proposed algorithms. All of the tests showed a fairly high efficiency of the proposed optimization methods in real operation conditions.",
author = "Kazantsev, {Yury V.} and Glazyrin, {Gleb V.} and Khalyasmaa, {Alexandra I.} and Shayk, {Sergey M.} and Kuparev, {Mihail A.}",
year = "2022",
doi = "10.3390/math10244809",
language = "English",
volume = "10",
pages = "4809",
journal = "Mathematics",
issn = "2227-7390",
publisher = "Multidisciplinary Digital Publishing Institute (MDPI)",
number = "24",

}

RIS

TY - JOUR

T1 - Advanced Algorithms in Automatic Generation Control of Hydroelectric Power Plants

AU - Kazantsev, Yury V.

AU - Glazyrin, Gleb V.

AU - Khalyasmaa, Alexandra I.

AU - Shayk, Sergey M.

AU - Kuparev, Mihail A.

PY - 2022

Y1 - 2022

N2 - The problem of load distribution between hydraulic units at hydropower plants is a difficult task due to the nonlinearity of hydro turbine characteristics and individual peculiarities of the generation units, in which operating conditions are often different. It is necessary to apply the most up-to-date optimization methods that take into account the nonlinearity of the turbine characteristics. The methods must also consider strict constraints on the operation conditions of the power equipment when searching for the extremum of the objective function specified in the form of equalities and inequalities. When solving the aforementioned optimization problem, the constraints on computing capacities of the digital automatic generation control systems that must operate in real-time mode were taken into account. To solve the optimization task, the interior point method was analyzed and the method of Lagrange multipliers was modified so that it could minimize turbine discharge and active energy losses in the windings of the power generators and unit power transformers. The article presents the simulation results of the developed optimization algorithms and the results of the field tests of the automatic generation control system executing the proposed algorithms. All of the tests showed a fairly high efficiency of the proposed optimization methods in real operation conditions.

AB - The problem of load distribution between hydraulic units at hydropower plants is a difficult task due to the nonlinearity of hydro turbine characteristics and individual peculiarities of the generation units, in which operating conditions are often different. It is necessary to apply the most up-to-date optimization methods that take into account the nonlinearity of the turbine characteristics. The methods must also consider strict constraints on the operation conditions of the power equipment when searching for the extremum of the objective function specified in the form of equalities and inequalities. When solving the aforementioned optimization problem, the constraints on computing capacities of the digital automatic generation control systems that must operate in real-time mode were taken into account. To solve the optimization task, the interior point method was analyzed and the method of Lagrange multipliers was modified so that it could minimize turbine discharge and active energy losses in the windings of the power generators and unit power transformers. The article presents the simulation results of the developed optimization algorithms and the results of the field tests of the automatic generation control system executing the proposed algorithms. All of the tests showed a fairly high efficiency of the proposed optimization methods in real operation conditions.

UR - https://gateway.webofknowledge.com/gateway/Gateway.cgi?GWVersion=2&SrcAuth=tsmetrics&SrcApp=tsm_test&DestApp=WOS_CPL&DestLinkType=FullRecord&KeyUT=000902943200001

UR - http://www.scopus.com/inward/record.url?partnerID=8YFLogxK&scp=85146274562

U2 - 10.3390/math10244809

DO - 10.3390/math10244809

M3 - Article

VL - 10

SP - 4809

JO - Mathematics

JF - Mathematics

SN - 2227-7390

IS - 24

ER -

ID: 33249564