Description of measures to organize a department for production of long length pipes at OJSC «Sinarsky Pipe Plant». Description of shortcomings for previous batched production type. Introduction of tube plug drawing sequence using the expert automatic system. Review of drawing force, processing limits, possible micro- and macro fractures during drawing. Consideration of measures for further development of long length pipes production.
Translated title of the contributionManufacture of Cold Formed Long Pipes in the OJSC "Sinarsky Pipe Plant"
Original languageRussian
Pages (from-to)34-35
Number of pages2
JournalСталь
Issue number12
Publication statusPublished - 2013

    Level of Research Output

  • VAK List

    GRNTI

  • 53.47.00

ID: 8202628