The questions connected with connection of small generation objects to distributive networks of the electric grid companies are considered. The analysis of technical feasibility accession installations of small generation is carried out and the technique for assessment of expediency and optimization placement objects small generation in distributive networks of the electric grid company is offered.
Translated title of the contributionAnalysis of technical feasibility accession installations of small generation for parallel work with electric grid company network
Original languageRussian
Pages (from-to)51-56
JournalЭнергетика Татарстана
Issue number3 (31)
Publication statusPublished - 2013