DOI

This article proposes a practical algorithm to calculate the standard time to account for the increase in the share of passive monitoring when performing technological operations in small-scale production of complex technology products. On the basis of a series conducted by the authors of the studies of work time expenditures on scientific-production enterprise performed the testing.
Translated title of the contributionFeatures of working time calculation in the conditions of small batch production of complex technology products
Original languageRussian
Pages (from-to)483-494
Number of pages10
JournalЭкономика труда
Volume6
Issue number1
DOIs
Publication statusPublished - 2019

    GRNTI

  • 27.43.00

    Level of Research Output

  • VAK List

ID: 9856948